
Five furniture groups in a pharmacy
A pharmacy needs 5 furniture groups: a service counter, a drawer wall, a shelf run, an island and a waiting bench. Five groups cover 90 percent of a 100 sqm shop. We keep the alternative on the same quotation, so the owner compares a number instead of a colour. That number belongs on the fit out drawing, because a counter length agreed verbally rarely survives the first script queue.
A shop that buys shelving first and a counter last opens 3 weeks late. The counter carries the till and the prescription hand off, and a hand off needs retail displays. Most of these gaps appear in the first month, which is exactly when the script queue is longest. Mark it on the drawing sheet too, so whoever adds a shelf later has the reference without guessing.
The 3 m service counter
A pharmacy service counter runs 3 m and splits into 2 m script and 1 m retail. A 3 m counter serves 30 scripts an hour and a 1.5 m counter serves kiosk design. One counter hour settles the question faster than a week of drawing revisions. None of that shows in a sketch, which is why we mark the drawer pitch and the aisle on the plan.
Set the script bench at 900 mm and the customer rail at 1,100 mm. A rail at 1,100 mm hides the screen from a queue and a rail at 900 mm shows a patient name. Owners who settle it at design stage pay nothing extra, and owners who settle it after opening pay for a second wall. The same rule holds for a mall unit and a high street pharmacy, with the aisle mattering in both.
The drawer wall at 40 mm
A pharmacy drawer wall runs 40 mm drawer pitch and 500 mm depth. A 40 mm pitch holds 12 rows per metre and a 60 mm pitch holds 8, and 8 rows means a service kiosk. We keep the alternative on the same quotation, so the owner compares a number instead of a colour. That number belongs on the fit out drawing, because a counter length agreed verbally rarely survives the first script queue.
Label the drawers at 100 mm and not at 20 mm. A 100 mm label is read at 2 m in a hurry and a 20 mm label is read by staff only, and staff are 6 of 30 glass showcases. Most of these gaps appear in the first month, which is exactly when the script queue is longest.
The 1,400 mm shelf rule
A pharmacy shelf run sits at 1,400 mm to the top shelf and 900 mm to the third. A 1,400 mm top is a reach and a 1,600 mm top is a step, and a step in a pharmacy is a fixture materials. Mark it on the drawing sheet too, so whoever adds a shelf later has the reference without guessing.
Keep a 300 mm gap under the bottom shelf. A 300 mm gap lets a mop in and a 100 mm gap collects dust, and dust in a medicine shelf is an shop fixtures. One counter hour settles the question faster than a week of drawing revisions. None of that shows in a sketch, which is why we mark the drawer pitch and the aisle on the plan.
Add a 900 mm waiting bench for 3. A bench at 900 mm holds 3 patients and a bench at 450 mm holds 3 children, and a pharmacy queue is mostly over 60. Owners who settle it at design stage pay nothing extra, and owners who settle it after opening pay for a second wall. The same rule holds for a mall unit and a high street pharmacy, with the aisle mattering in both.

Seven numbers for a pharmacy fit
The table is the furniture we quote for a 100 sqm pharmacy, and each line answers a bench, a drawer or a height rather than display cases. We keep the alternative on the same quotation, so the owner compares a number instead of a colour. That number belongs on the fit out drawing, because a counter length agreed verbally rarely survives the first script queue.
| Item | Number |
|---|---|
| Service counter | 3 m, 2 m script |
| Script bench | 900 mm |
| Customer rail | 1,100 mm |
| Drawer pitch | 40 mm |
| Drawer depth | 500 mm |
| Shelf top | 1,400 mm |
| Waiting bench | 900 mm, 3 seats |

Glass and the 8 mm
A pharmacy glass case runs 8 mm on the front and a lock on every section. An 8 mm front holds a 20 kg stock load and a 6 mm front bows at 15 kg over 1,200 mm. Most of these gaps appear in the first month, which is exactly when the script queue is longest. Mark it on the drawing sheet too, so whoever adds a shelf later has the reference without guessing.
Keep the lock at 900 mm and the key at the counter. A lock at 900 mm is opened in 4 seconds and a lock at 300 mm means a pharmacist kneels counters and towers. One counter hour settles the question faster than a week of drawing revisions. None of that shows in a sketch, which is why we mark the drawer pitch and the aisle on the plan.
The 4 m circulation
A pharmacy needs a 4 m main aisle for a wheelchair and a trolley. A 4 m aisle passes 2 trolleys and a 2.4 m aisle passes 1 and blocks a second at the refrigerator. Owners who settle it at design stage pay nothing extra, and owners who settle it after opening pay for a second wall. The same rule holds for a mall unit and a high street pharmacy, with the aisle mattering in both.
Put the refrigerator on the aisle and not in a corner. A fridge at 4 m from the door sells 1 in 6 and a fridge in a corner sells 1 in 20, and a corner fridge is a cold cash counters. We keep the alternative on the same quotation, so the owner compares a number instead of a colour.

Budget and the 3 group
A pharmacy fit runs 300,000 to 600,000 yuan for 100 sqm with 3 furniture groups. A 600,000 fit adds a 5th group and a 300,000 fit buys 3 and adds later. That number belongs on the fit out drawing, because a counter length agreed verbally rarely survives the first script queue. Most of these gaps appear in the first month, which is exactly when the script queue is longest.
Spend on the counter and the drawer wall first. A counter at 3 m and a drawer wall at 40 mm carry 70 percent of the trade, and a shelf run can wait cosmetic kiosk. Mark it on the drawing sheet too, so whoever adds a shelf later has the reference without guessing. One counter hour settles the question faster than a week of drawing revisions.
Conclusion
A 3 m counter, a 900 mm script bench, a 1,100 mm rail, a 40 mm drawer pitch at 500 mm depth, a 1,400 mm shelf top, a 900 mm bench and a 4 m aisle. Those seven make a pharmacy. None of that shows in a sketch, which is why we mark the drawer pitch and the aisle on the plan.
Buy the counter and the drawers before the shelving. A pharmacy that serves 30 scripts an hour pays for the bench in 2 weeks and a shelving debt fixture systems. Owners who settle it at design stage pay nothing extra, and owners who settle it after opening pay for a second wall. The same rule holds for a mall unit and a high street pharmacy, with the aisle mattering in both.
Depth the drawer wall at 500 mm and the counter at 700 mm. A 400 mm drawer cannot hold a 300 mm medicine carton and a shallow drawer means a second wall. We keep the alternative on the same quotation, so the owner compares a number instead of a colour. That number belongs on the fit out drawing, because a counter length agreed verbally rarely survives the first script queue.

