
4 steps, 90 days in Spain
A candy store in Spain opens in 4 steps over 90 days: a licence, a fit, a stock order and a food safety sign off. Four steps at 90 days is a realistic town centre opening. We keep the alternative on the same quotation, so the owner compares a pitch instead of a colour. That number belongs on the shop plan, because a shelf pitch agreed verbally rarely survives the first delivery.
A licence takes 30 days at an ayuntamiento and a fit takes 45. A shop that orders stock before a licence holds 12,000 euro of sugar in a room with retail displays. Most of these gaps appear at the first restock, which is exactly when the wall is fullest. Mark it on the drawing sheet too, so whoever adds a shelf later has the reference without guessing.
Step 1: the licence
A Spanish candy shop needs an apertura licence, a food handler certificate and, for bulk, a sanitary register. Three documents at a town hall cost 600 to 1,200 euro. One delivery day settles the question faster than a week of revision rounds. None of that shows in a mood board, which is why we mark the shelf pitch and the bin depth on the plan.
A bulk bin shop also needs a traceability record per lot. A record per lot at 1 page per 8 weeks is 6 pages a year and an inspector asks for 2 years at kiosk design. Owners who settle it at design stage pay nothing extra, and owners who settle it after opening pay a re-fit. The same rule holds for a town centre shop and a coast shop, with the season mattering in both.
Step 2: the 22 sqm fit
A candy shop at 22 sqm runs a 6 m wall, a 3 m counter and a 2 m checkout. Six metres of wall at 5 shelves is 12 linear metres of candy and 240 bin facings. We keep the alternative on the same quotation, so the owner compares a pitch instead of a colour. That number belongs on the shop plan, because a shelf pitch agreed verbally rarely survives the first delivery.
A bin facing at 200 mm holds 3 kg and a facing at 300 mm holds 6. Two hundred and forty facings at 3 kg is 720 kg of candy and 720 kg at 8 euro is 5,760 euro glass showcases. Most of these gaps appear at the first restock, which is exactly when the wall is fullest.
Step 3: the 5 shelf pitch
A candy wall runs 5 shelves at 300 mm pitch from 600 mm to 1,800 mm. Five shelves at 300 mm keep a 250 mm scoop bin reachable and a 400 mm pitch puts 1 shelf out of reach. Mark it on the drawing sheet too, so whoever adds a shelf later has the reference without guessing. One delivery day settles the question faster than a week of revision rounds.
Put bulk at 900 to 1,200 mm and packaged at 1,500 to 1,800. Bulk at 900 mm is scooped by a child at 1,200 mm and packaged at 1,700 is read by shop fixtures. None of that shows in a mood board, which is why we mark the shelf pitch and the bin depth on the plan.
Scoop a bin at 250 mm deep with a 180 mm scoop. A 250 mm bin at 180 mm scoop leaves a hand clear of a rim and a 400 mm bin forces a wrist counters and towers. Owners who settle it at design stage pay nothing extra, and owners who settle it after opening pay a re-fit.

Seven numbers for a Spanish shop
The table is the fit we quote for a 22 sqm Spanish candy shop, and each line answers a pitch, a facing or a kilo rather than display cases. The same rule holds for a town centre shop and a coast shop, with the season mattering in both. We keep the alternative on the same quotation, so the owner compares a pitch instead of a colour.
| Item | Number |
|---|---|
| Shop size | 22 sqm |
| Wall run | 6 m |
| Shelf pitch | 300 mm |
| Facings | 240 |
| Bin facing | 200 mm, 3 kg |
| Bin depth | 250 mm |
| Stock | 720 kg |

Hygiene and the 3 rules
Bulk candy in Spain runs 3 hygiene rules: a scoop per bin, a covered bin and a clean record. Three rules keep a bulk shop open and 1 missed rule closes a bulk section. That number belongs on the shop plan, because a shelf pitch agreed verbally rarely survives the first delivery. Most of these gaps appear at the first restock, which is exactly when the wall is fullest.
A scoop per bin costs 4 euro and 240 scoops is 960 euro. A shop that shares 20 scoops fails 1 of 3 visits, and a failed visit means a bulk section closed fixture materials. Mark it on the drawing sheet too, so whoever adds a shelf later has the reference without guessing. One delivery day settles the question faster than a week of revision rounds.
The 8 euro kilo
A Spanish candy shop sells bulk at 8 euro a kilo and packaged at 12. Bulk is 60 percent of revenue at 5,760 euro of stock and packaged is 40 percent at 3,000. None of that shows in a mood board, which is why we mark the shelf pitch and the bin depth on the plan. Owners who settle it at design stage pay nothing extra, and owners who settle it after opening pay a re-fit.
A kilo at 8 euro carries a 55 percent margin and a 12 euro box carries 45. Bulk pays the rent and packaged pays the brand, so a shop cash counters. The same rule holds for a town centre shop and a coast shop, with the season mattering in both. We keep the alternative on the same quotation, so the owner compares a pitch instead of a colour.
90 days and the 6 week
A 90 day opening breaks into 30 days of licence, 45 of fit and 15 of stocking. A 6 week factory lead means an order placed at day 30 and installed at day 72. That number belongs on the shop plan, because a shelf pitch agreed verbally rarely survives the first delivery. Most of these gaps appear at the first restock, which is exactly when the wall is fullest.
A shop that orders at day 60 installs at day 102 and misses a summer season. A July season at a Spanish coast town is 40 percent of a year and a 12 day slip service kiosk. Mark it on the drawing sheet too, so whoever adds a shelf later has the reference without guessing. One delivery day settles the question faster than a week of revision rounds.

Conclusion
Four steps, 90 days, a 22 sqm shop, a 6 m wall, 5 shelves at 300 mm, 240 facings, a 250 mm bin, 720 kg of stock and a scoop per bin. Those lines open a Spanish shop. None of that shows in a mood board, which is why we mark the shelf pitch and the bin depth on the plan.
Order the fit at day 30 and never the stock. A licence at day 30 and a factory at 6 weeks puts a candy shop open in a season, and a season is the year. Owners who settle it at design stage pay nothing extra, and owners who settle it after opening pay a re-fit. The same rule holds for a town centre shop and a coast shop, with the season mattering in both.
Depth a bin at 250 mm and a shelf at 300 mm. A 200 mm bin spills a scoop at a rim and a shallow shelf leaves a 3 kg bag hanging mall layout. We keep the alternative on the same quotation, so the owner compares a pitch instead of a colour. That number belongs on the shop plan, because a shelf pitch agreed verbally rarely survives the first delivery.

