
Food culture sets the counter
Middle Eastern food culture is a sharing culture, and a sharing culture sets a counter differently. A mezze plate at 200 mm sits beside 6 more, and a counter built for single plates holds 6 and not 18. The same rule holds for a mall unit and a street restaurant, with the majlis corner mattering in both. We keep the alternative on the same quotation, so the owner compares a number instead of a pattern.
A restaurant that treats mezze as a starter builds 1 case and a restaurant that treats it as a table builds 6 m of case. The 6 m is the culture, retail displays. That number belongs on the counter drawing, because a run length agreed verbally rarely survives the first mezze service. Most of these gaps appear at the first peak, which is exactly when the run is fullest.
The 6 m case run
A mezze run needs 6 m of glass at 850 mm. A 6 m run at 850 mm shows 60 bowls and a 3 m run shows 30, and 30 bowls read as a menu and 60 read as a culture. Mark it on the drawing sheet too, so whoever adds a dish later has the reference without guessing.
Set the run at 2 levels: 850 mm and 1,250 mm. Two levels give 60 bowls in 3 m and one level needs 6 m of glass, and glass is the cost kiosk design. One Friday settles the question faster than a week of drawing revisions. None of that shows in a sketch, which is why we mark the bowl line and the tagine shelf on the plan.
Tagine and the 900 mm
A tagine is 300 mm wide and 250 mm tall, and it needs a shelf at 900 mm. A tagine on a 700 mm shelf cannot be lifted out and a tagine at a 250 mm rim spills glass showcases. Owners who settle it at design stage pay nothing extra, and owners who settle it after opening pay for a second run.
Hold tagines on a 400 mm plate at 900 mm. A 400 mm plate holds 1 tagine and a stack holds 3, and a stack of 3 at 900 mm sells 2 of 3. The same rule holds for a mall unit and a street restaurant, with the majlis corner mattering in both. We keep the alternative on the same quotation, so the owner compares a number instead of a pattern.
The 4 C mezze rule
Mezze holds at 4 C and a hummus holds 3 days. A case at 8 C holds a hummus 24 hours, and a 24 hour hummus is a complaint at 9 pm fixture materials. That number belongs on the counter drawing, because a run length agreed verbally rarely survives the first mezze service. Most of these gaps appear at the first peak, which is exactly when the run is fullest.
Refrigerate on a 2 level pan at 100 mm. A 100 mm pan holds 4 C better than a 200 mm bowl, and a bowl at 200 mm warms at the rim by hour 3. Mark it on the drawing sheet too, so whoever adds a dish later has the reference without guessing. One Friday settles the question faster than a week of drawing revisions.
Serve from a 100 mm pan and refill twice a day. A pan refilled twice holds 4 C and a bowl filled once holds 9 C at the rim, and a warm rim is a shop fixtures. None of that shows in a sketch, which is why we mark the bowl line and the tagine shelf on the plan.

Majlis seating and the 1,200
A majlis bench runs 1,200 mm and holds 3 people with a 450 mm seat. A 1,200 mm bench at 450 mm is the sharing unit, and a 4 seat table is the same food in a European frame. Owners who settle it at design stage pay nothing extra, and owners who settle it after opening pay for a second run.
Set a low table at 400 mm for a majlis corner. A 400 mm table reads as a sharing room and a 750 mm table reads as a restaurant, and a guest knows the difference counters and towers. The same rule holds for a mall unit and a street restaurant, with the majlis corner mattering in both. We keep the alternative on the same quotation, so the owner compares a number instead of a pattern.
Six numbers for a mezze counter
The table is the counter we quote for a Middle Eastern restaurant, and each line answers a bowl, a shelf or a temperature rather than display cases. That number belongs on the counter drawing, because a run length agreed verbally rarely survives the first mezze service. Most of these gaps appear at the first peak, which is exactly when the run is fullest.
| Item | Number |
|---|---|
| Mezze run | 6 m at 850 mm |
| Levels | 850 and 1,250 mm |
| Bowl size | 200 mm, 100 mm pan |
| Tagine shelf | 900 mm on a 400 mm plate |
| Holding temp | 4 C |
| Majlis bench | 1,200 mm, 450 mm seat |
| Low table | 400 mm |

Bread and the 600 mm
Bread goes at 600 mm on its own shelf and not with the mezze. A bread shelf at 600 mm holds 20 loaves and a bread bowl on a mezze shelf holds 6 and takes 300 mm cash counters. Mark it on the drawing sheet too, so whoever adds a dish later has the reference without guessing.
Keep the bread warm and separate at 40 C. Bread at 40 C reads fresh and bread at 22 C reads cold at the second piece, and the second piece is the one that sells. One Friday settles the question faster than a week of drawing revisions. None of that shows in a sketch, which is why we mark the bowl line and the tagine shelf on the plan.
Tea and the 3 glass
Tea closes a Middle Eastern meal and a tea station at 900 mm holds 3 glasses. Three glasses at 900 mm pour 40 an hour and a samovar on a 700 mm table pours 20. Owners who settle it at design stage pay nothing extra, and owners who settle it after opening pay for a second run. The same rule holds for a mall unit and a street restaurant, with the majlis corner mattering in both.
Put the tea station at the exit at 900 mm. A station at the exit sells 1 tea in 4 and a station inside sells 1 in 10, because a guest leaves when the meal is done. We keep the alternative on the same quotation, so the owner compares a number instead of a pattern. That number belongs on the counter drawing, because a run length agreed verbally rarely survives the first mezze service.

Staff and the 18 bowl
A mezze counter needs 1 staff per 18 bowls and a refill every 90 minutes. A run of 60 bowls with 1 staff goes empty at 4 of 60 by hour 2, and an empty bowl reads as a refrigerated display cases. Most of these gaps appear at the first peak, which is exactly when the run is fullest.
Mark a refill line inside the bowl. A line at 30 mm under the rim is a 3 second check, and a check of 3 seconds catches 4 bowls before a guest juice kiosk. Mark it on the drawing sheet too, so whoever adds a dish later has the reference without guessing. One Friday settles the question faster than a week of drawing revisions.
Conclusion
6 m of glass at 850 mm, 2 levels, 60 bowls, a tagine at 900 mm, a 100 mm pan at 4 C, a 1,200 mm majlis bench and a tea station at the exit. Those seven hold the culture. None of that shows in a sketch, which is why we mark the bowl line and the tagine shelf on the plan.
Food culture shows in the run length and the seat height, not in a pattern on a wall. Build 6 m and 400 mm and the room reads as a sharing room from the door. Owners who settle it at design stage pay nothing extra, and owners who settle it after opening pay for a second run. The same rule holds for a mall unit and a street restaurant, with the majlis corner mattering in both.
Depth the mezze case at 700 mm and the bread shelf at 500 mm. A 500 mm case cannot take a 200 mm bowl and a tagine, and a shallow case is a bowl on a tray edge. We keep the alternative on the same quotation, so the owner compares a number instead of a pattern. That number belongs on the counter drawing, because a run length agreed verbally rarely survives the first mezze service.

