30 sqm is one counter and 8 seats

322 sq ft is 30 sqm. That is a 3 m counter, 8 seats and a 1.2 m pass, and the whole shop is decided by those three numbers glass showcases. Most of these gaps appear on the first 7 am peak, which is exactly when the queue forms. Mark it on the drawing sheet too, so whoever moves a grinder later has the reference without guessing.

A 30 sqm cafe with 16 seats has no pass. A cafe with 16 seats needs 45 sqm, and a shop that borrows the difference borrows it from the queue. One shift with a stopwatch settles the question faster than a week of drawing revisions. None of that shows in a render, which is why we mark the lane and the knock box on the plan.

The 3 m counter and 2 groups

A 3 m counter holds a 2 group machine, a grinder, a sink, a fridge and a till. A 2 group machine makes 60 shots an hour and 2 grinders make 90, so the grinder is the limit. Clients who settle it at design stage pay nothing extra, and clients who settle it after opening pay for a re build.

One grinder at 30 sqm, not two. A second grinder costs 600 mm of counter and lifts nothing, because the machine cannot pull faster than the first is kiosk design. The same rule holds for a high street unit and a mall corner, with the peak mattering more in a mall. We keep the alternative on the same quotation, so the owner compares a number instead of a style.

The 900 mm barista lane

A barista needs 900 mm between the counter and the wall, and 1200 mm behind a till. A lane at 700 mm fits a person and loses the turn, and a turn lost at peak is a queue. That number belongs on the cafe plan, because a counter length agreed verbally rarely survives the first fit out. Most of these gaps appear on the first 7 am peak, which is exactly when the queue forms.

Put the fridge under the counter, not behind the barista. A fridge behind the barista adds 600 mm of walk to every milk, and milk is 8 of every refrigerated cases. Mark it on the drawing sheet too, so whoever moves a grinder later has the reference without guessing. One shift with a stopwatch settles the question faster than a week of drawing revisions.

Work triangle: 1.5 m

The barista triangle runs 1.5 m from grinder to machine to milk. A triangle at 2.5 m walks 3 steps per drink, and 3 steps at 40 drinks an hour is 120 steps. None of that shows in a render, which is why we mark the lane and the knock box on the plan. Clients who settle it at design stage pay nothing extra, and clients who settle it after opening pay for a re build.

Set the knock box 200 mm from the machine. A knock box at the end of the counter adds 1 step per shot, and 1 step is 60 steps in a busy hour. The same rule holds for a high street unit and a mall corner, with the peak mattering more in a mall. We keep the alternative on the same quotation, so the owner compares a number instead of a style.

food kiosk

Keep the till 600 mm from the handoff point. A till at the far end makes the barista walk to take payment, and a walk is where the order dessert kiosk. That number belongs on the cafe plan, because a counter length agreed verbally rarely survives the first fit out. Most of these gaps appear on the first 7 am peak, which is exactly when the queue forms.

window coffee bar

8 seats at 600 mm

A seat at a 600 mm bar needs 600 mm of width and a 900 mm back clearance. Eight seats is 4.8 m of bar, and a 4.8 m bar in 30 sqm leaves no room for a table. Mark it on the drawing sheet too, so whoever moves a grinder later has the reference without guessing. One shift with a stopwatch settles the question faster than a week of drawing revisions.

Two 2 seat tables beat four bar stools for dwell time. A bar stool stays 12 minutes and a table stays 25, and 25 minutes at 2 cups is the shop fixtures. None of that shows in a render, which is why we mark the lane and the knock box on the plan. Clients who settle it at design stage pay nothing extra, and clients who settle it after opening pay for a re build.

Power, water and the 5 filter rule

A 30 sqm cafe needs 32 A single phase, a 15 mm water inlet, a 40 mm drain and a grease trap. A shop on 16 A cannot run a 2 group and a fridge at once. The same rule holds for a high street unit and a mall corner, with the peak mattering more in a mall.

Change the water filter every 5,000 litres. A filter past 5,000 litres scales the boiler, and a scaled boiler costs a service call and fixture materials. We keep the alternative on the same quotation, so the owner compares a number instead of a style. That number belongs on the cafe plan, because a counter length agreed verbally rarely survives the first fit out.

12 items, 40 an hour

A 30 sqm cafe runs 12 menu items at 40 drinks an hour with 2 staff. A 24 item menu at 30 sqm slows the barista and lifts the waste, and waste is the margin. Most of these gaps appear on the first 7 am peak, which is exactly when the queue forms. Mark it on the drawing sheet too, so whoever moves a grinder later has the reference without guessing.

Cut an item that sells under 5 a day. A drink at 5 a day holds a syrup on the counter for a month, and a month of counter space is 4 sq retail displays. One shift with a stopwatch settles the question faster than a week of drawing revisions. None of that shows in a render, which is why we mark the lane and the knock box on the plan.

white stool bar

Rent, ticket and the 3 times rule

Rent should be under a third of gross. A 30 sqm shop at 40 drinks an hour and a 4.5 ticket makes 720 a day, and rent at 240 a day is the ceiling. Clients who settle it at design stage pay nothing extra, and clients who settle it after opening pay for a re build. The same rule holds for a high street unit and a mall corner, with the peak mattering more in a mall.

A ticket under 4 needs 60 drinks an hour to pay the same rent. A shop that cannot reach 60 changes the model to a kiosk, and a kiosk pays a counters and towers. We keep the alternative on the same quotation, so the owner compares a number instead of a style. That number belongs on the cafe plan, because a counter length agreed verbally rarely survives the first fit out.

Seven numbers for a 30 sqm cafe

The table is the shape we quote for a 322 sq ft cafe, and each line is a counter decision rather than a cash counters. Most of these gaps appear on the first 7 am peak, which is exactly when the queue forms. Mark it on the drawing sheet too, so whoever moves a grinder later has the reference without guessing.

Item Number
Floor 30 sqm, 3 m counter
Machine 2 group, 60 shots an hour
Grinder 1, one dial
Barista lane 900 mm, 1200 mm at till
Seats 8, 600 mm each
Menu 12 items, 40 an hour
Power 32 A single phase
grey wall coffee bar

The 2 hour peak

A cafe makes 60 percent of the day in 3 hours: 7 to 9, 12 to 1 and 3 to 4. A shop built for the average is a shop built for the other 5 hours. One shift with a stopwatch settles the question faster than a week of drawing revisions. None of that shows in a render, which is why we mark the lane and the knock box on the plan.

Add one staff member at peak and cut one at 10 am. A 30 sqm shop with 3 staff all day pays 24 hours for 9 hours of trade, and that is the failure mode. Clients who settle it at design stage pay nothing extra, and clients who settle it after opening pay for a re build. The same rule holds for a high street unit and a mall corner, with the peak mattering more in a mall.

Milk, waste and the 18 percent

Milk is 8 of 10 drinks and holds 5 days. Order 3 days of milk, not 7, and a 30 sqm shop needs one fridge and one backup crate at 4 C. We keep the alternative on the same quotation, so the owner compares a number instead of a style. That number belongs on the cafe plan, because a counter length agreed verbally rarely survives the first fit out.

Waste should sit under 18 percent. A cafe at 25 percent waste throws 1 of every 4 litres, and the litres are the difference between a profit and a rent payment. Most of these gaps appear on the first 7 am peak, which is exactly when the queue forms. Mark it on the drawing sheet too, so whoever moves a grinder later has the reference without guessing.

Wood Coffee Counter

Conclusion

A 3 m counter, a 2 group machine, a 900 mm lane, 8 seats and 12 items. Those five carry a 30 sqm cafe through a peak it cannot staff twice. One shift with a stopwatch settles the question faster than a week of drawing revisions. None of that shows in a render, which is why we mark the lane and the knock box on the plan.

Build the bar, not the room. A 30 sqm cafe that spends on the counter earns 40 an hour, and one that spends on the walls earns the same at half the speed. Clients who settle it at design stage pay nothing extra, and clients who settle it after opening pay for a re build. The same rule holds for a high street unit and a mall corner, with the peak mattering more in a mall.

fixture depth

Depth the counter at 700 mm and the under counter fridge at 600 mm. A 500 mm counter cannot take a 2 group machine and a dump tray, and the tray ends display cases. We keep the alternative on the same quotation, so the owner compares a number instead of a style. That number belongs on the cafe plan, because a counter length agreed verbally rarely survives the first fit out.