Avada Car Dealer News

90 seconds per order

A US tea franchise sets its counter around one number: 90 seconds from order to hand-off. Everything on the counter either shortens that number or lengthens it. That number belongs on the counter drawing, because a station length agreed verbally rarely survives the first peak. Most of these gaps appear in week one, which is exactly when the first order lands.

Look at a FengCha style outlet and the loop is visible: order at the left, weigh and shake in the middle, seal and hand off at the right. The counter is a line, glass showcases. Mark it on the drawing sheet too, so whoever services the sealer later has the reference without guessing. One Saturday peak with a stopwatch settles the question faster than a week of drawing revisions.

The three-station loop

Station one is order and payment at 1000 mm, station two is tea and shake at 900 mm, station three is seal and hand off at 1000 mm. Three stations, 600 mm each, 1.8 m total. None of that shows in a render, which is why we mark the sink positions and the station lengths on the plan. Clients who settle it at design stage pay nothing extra, and clients who settle it after opening pay for a rebuild.

A counter under 1.8 m forces one staff member to walk between stations, and a walk of 1 m adds 15 seconds to every order. At 200 orders a day that is 50 minutes of kiosk design. The same rule holds for a mall unit and a street shop, with the drain mattering more inside a mall.

Cup size drives the sink

US sizes run 16, 20 and 24 oz, and a 24 oz cup needs a 400 mm sink with a 300 mm depth. A 300 mm sink at a 24 oz store spills on the counter at every rinse. We keep the alternative on the same quotation, so the buyer compares a number instead of a preference. That number belongs on the counter drawing, because a station length agreed verbally rarely survives the first peak.

Two sinks, not one. A rinse sink and a hand sink 600 mm apart meet most health codes, and a single sink used for both is the first write-up on an inspection. Most of these gaps appear in week one, which is exactly when the first order lands. Mark it on the drawing sheet too, so whoever services the sealer later has the reference without guessing.

drink kiosk

Keep the sealer 300 mm from the hand-off edge. A sealer at the edge puts the cup over the customer side, and a dropped cup at hand-off is a refund and a spill. One Saturday peak with a stopwatch settles the question faster than a week of drawing revisions. None of that shows in a render, which is why we mark the sink positions and the station lengths on the plan.

white tea counter

Tapioca on a 4 hour clock

Cooked tapioca holds 4 hours at 60 C and turns hard after 5. A franchise outlet cooks 3 batches a day and holds each batch in a 5 litre warmer at the shake station. Clients who settle it at design stage pay nothing extra, and clients who settle it after opening pay for a rebuild. The same rule holds for a mall unit and a street shop, with the drain mattering more inside a mall.

Plan the warmer 300 mm from the shake station and 200 mm back. A warmer at the front blocks the shaker, and a warmer at the back means a turn for food kiosk. We keep the alternative on the same quotation, so the buyer compares a number instead of a preference. That number belongs on the counter drawing, because a station length agreed verbally rarely survives the first peak.

Ice, water and the drain

A tea counter uses 40 to 60 kg of ice a day and 200 litres of water. Plan an ice bin at 600 mm and a drain line under the counter, not a bucket counters and towers. Most of these gaps appear in week one, which is exactly when the first order lands. Mark it on the drawing sheet too, so whoever services the sealer later has the reference without guessing.

A counter without a floor drain mops twice an hour in summer. A mop at the counter is a slip claim, and a slip claim at a franchise is a shop fixtures. One Saturday peak with a stopwatch settles the question faster than a week of drawing revisions. None of that shows in a render, which is why we mark the sink positions and the station lengths on the plan.

Menu board and the 6 m rule

A US tea menu board sits at 2100 to 2400 mm and reads at 6 m, which is the depth of a mall queue. Text under 40 mm at that height is unreadable from the back. Clients who settle it at design stage pay nothing extra, and clients who settle it after opening pay for a rebuild. The same rule holds for a mall unit and a street shop, with the drain mattering more inside a mall.

Keep the board to 12 lines. A board with 30 lines slows the order by 20 seconds per customer, and 20 seconds at peak is a queue cash counters. We keep the alternative on the same quotation, so the buyer compares a number instead of a preference. That number belongs on the counter drawing, because a station length agreed verbally rarely survives the first peak.

orange tea bar

Sweetness, ice, and the modifiers

US orders ask for sweetness and ice levels, and each modifier adds a step. Plan a sticker or a label printer at the order station so the cup carries the modifiers. Most of these gaps appear in week one, which is exactly when the first order lands. Mark it on the drawing sheet too, so whoever services the sealer later has the reference without guessing.

A cup without a label gets remade once in twenty orders. A remake costs a cup, a tea and 90 seconds, and the 90 seconds is the fixture materials. One Saturday peak with a stopwatch settles the question faster than a week of drawing revisions. None of that shows in a render, which is why we mark the sink positions and the station lengths on the plan.

The 6 sqm mall unit

A mall tea unit fits in 6 sqm: 1.8 m counter, 600 mm back work top, 600 mm ice and sink, 900 mm queue space. That kit serves 120 orders an hour with 3 staff. Clients who settle it at design stage pay nothing extra, and clients who settle it after opening pay for a rebuild. The same rule holds for a mall unit and a street shop, with the drain mattering more inside a mall.

A street shop at 30 sqm adds seating and a second counter, and the seating does not raise the order rate. A tea shop with 12 seats still serves 120 an hour, so seats are a retail displays. We keep the alternative on the same quotation, so the buyer compares a number instead of a preference. That number belongs on the counter drawing, because a station length agreed verbally rarely survives the first peak.

yellow tea counter

Six numbers for a US tea counter

These six numbers come up in almost every US tea franchise layout review, and each one is cheaper to fix on a drawing than after opening. Most of these gaps appear in week one, which is exactly when the first order lands. Mark it on the drawing sheet too, so whoever services the sealer later has the reference without guessing.

  • Three stations, 600 mm each, 1.8 m total counter.
  • 90 seconds from order to hand-off.
  • Rinse sink 400 mm, hand sink 600 mm apart.
  • Tapioca warmer 4 hour hold at 60 C.
  • Ice 40 to 60 kg a day, floor drain under counter.
  • Menu board 2100 to 2400 mm, 12 lines, 6 m read.
green tea bar

Franchise standards and the local build

A franchise brand issues a design kit with counter dimensions, colours and sign specs. The local builder follows the kit, and the kit is why two outlets in two states look the same. One Saturday peak with a stopwatch settles the question faster than a week of drawing revisions. None of that shows in a render, which is why we mark the sink positions and the station lengths on the plan.

The kit does not cover the shell: floor level, drain position, power and ceiling height. Those four are the local work, and they are where a build fixture systems. Clients who settle it at design stage pay nothing extra, and clients who settle it after opening pay for a rebuild. The same rule holds for a mall unit and a street shop, with the drain mattering more inside a mall.

What to check before signing

Check the power draw, the drain location and the ceiling height before the lease. A tea counter draws 8 to 12 kW with kettles, warmers, fridges and the sealer. We keep the alternative on the same quotation, so the buyer compares a number instead of a preference. That number belongs on the counter drawing, because a station length agreed verbally rarely survives the first peak.

Check the mall rules on open water and grease. A tea unit needs a drain and a hand sink, and a mall that will not approve a drain will not approve a tea unit at all. Most of these gaps appear in week one, which is exactly when the first order lands. Mark it on the drawing sheet too, so whoever services the sealer later has the reference without guessing.

Conclusion

Three stations, 90 seconds, two sinks and a 4 hour tapioca clock. A US tea outlet is a service line with a menu board above it, and the line decides the day. One Saturday peak with a stopwatch settles the question faster than a week of drawing revisions. None of that shows in a render, which is why we mark the sink positions and the station lengths on the plan.

Copy the brand kit, adapt the shell. A tea shop that matches the brand and fights the drain loses the first month to plumbing. Clients who settle it at design stage pay nothing extra, and clients who settle it after opening pay for a rebuild. The same rule holds for a mall unit and a street shop, with the drain mattering more inside a mall.

fixture depth

Depth the counter at 700 mm for the shake station and 600 mm for order. A 500 mm shake bay cannot hold a shaker, a cup and a scoop at once, and one item ends on the floor. We keep the alternative on the same quotation, so the buyer compares a number instead of a preference. That number belongs on the counter drawing, because a station length agreed verbally rarely survives the first peak.

Leave A Comment