Avada Car Dealer News

LED is a queue tool

A bubble tea kiosk LED strip is not decoration, it is a queue tool. A lit counter at 900 mm tells 40 people on a mall concourse where the line starts. The same rule holds for a mall pitch and a station pitch, with the queue mattering in both. We keep the alternative on the same quotation, so the owner compares a number instead of a colour.

A shop with a lit canopy sells 120 cups a day and a shop with an unlit counter sells 90. Thirty cups at cash counters is 540 yuan a day and retail displays. That number belongs on the kiosk plan, because a watt figure agreed verbally rarely survives the first electricity bill. Most of these gaps appear at the first rush, which is exactly when the counter is busiest.

Three LED layers

A bubble tea kiosk runs 3 LED layers: a canopy sign at 2,400 mm, a strip under the counter at 900 mm and shop fixtures wash on the back panel. Three layers light a 6 sqm front. Mark it on the drawing sheet too, so whoever adds a station later has the reference without guessing. One Saturday settles the question faster than a week of drawing revisions.

The canopy is read at 20 m and the strip is read at 3 m. A back panel wash is read by nobody and it costs the same 400 yuan a metre kiosk design. None of that shows in a sketch, which is why we mark the strip height and the station split on the plan. Owners who settle it at design stage pay nothing extra, and owners who settle it after opening pay a driver upgrade.

Watt and the 12 W

An LED strip runs 12 W a metre and a canopy sign 40 W. A kiosk with 6 m of strip and one sign draws 112 W and 112 W on 12 hours costs 1.6 yuan a day. The same rule holds for a mall pitch and a station pitch, with the queue mattering in both. We keep the alternative on the same quotation, so the owner compares a number instead of a colour.

Keep a 24 V strip and not a 220 V strip. A 220 V strip at a wet counter at a mall needs an earth and a 24 V strip needs a 100 W driver at fixture materials. That number belongs on the kiosk plan, because a watt figure agreed verbally rarely survives the first electricity bill. Most of these gaps appear at the first rush, which is exactly when the counter is busiest.

Colour and the 3 tone

An LED runs 3 tones: a warm 2,700 K for the counter, a neutral 4,000 K for the canopy and a colour wash at 1 accent. Three tones keep a cup photo true. Mark it on the drawing sheet too, so whoever adds a station later has the reference without guessing. One Saturday settles the question faster than a week of drawing revisions.

A 2,700 K strip makes a brown sugar milk tea look amber, which is the colour a customer buys. A 5,000 K strip makes it grey and grey tea glass showcases. None of that shows in a sketch, which is why we mark the strip height and the station split on the plan. Owners who settle it at design stage pay nothing extra, and owners who settle it after opening pay a driver upgrade.

juice kiosk

Keep the strip 60 mm back from a counter edge. A strip at 60 mm lights a cup and a strip at 10 mm shows in the customer eye and 1 in 8 steps back counters and towers. The same rule holds for a mall pitch and a station pitch, with the queue mattering in both. We keep the alternative on the same quotation, so the owner compares a number instead of a colour.

boba counter LED

Seven numbers for a boba kiosk

The table is the kiosk we quote for a mall boba pitch, and each line answers a watt, a tone or a queue rather than a colour. That number belongs on the kiosk plan, because a watt figure agreed verbally rarely survives the first electricity bill. Most of these gaps appear at the first rush, which is exactly when the counter is busiest.

Item Number
Counter height 900 mm
Canopy sign 2,400 mm
Strip draw 12 W per metre
Strip tone 2,700 K
Strip set back 60 mm
Daily cups 120
Cup price 18 yuan
white purple boba

The 3 station line

A boba kiosk runs 3 stations: a syrup and cup station at 1,800 mm, a shake station at 1,200 mm and a seal and hand out station at 600 mm. Three stations move a cup in 40 seconds. Mark it on the drawing sheet too, so whoever adds a station later has the reference without guessing. One Saturday settles the question faster than a week of drawing revisions.

A cup at 40 seconds is 90 cups an hour and a cup at 70 seconds is 50. Fifty at a mall Saturday is a queue of 15 and 15 people walk out refrigerated cases. None of that shows in a sketch, which is why we mark the strip height and the station split on the plan.

Boba and the 4 hour

Cooked pearls hold 4 hours at 60 C and 2 hours at room temperature. A kiosk cooks 6 kg at 9 am and 6 kg at 2 pm and 7 kg left at 6 pm is 130 yuan dessert kiosk. Owners who settle it at design stage pay nothing extra, and owners who settle it after opening pay a driver upgrade.

Batch 3 kg and not 6 kg. Six kg at 9 am covers 3 hours of a morning and a morning at 60 cups needs 2 kg, so 6 kg is 4 kg wasted before noon. The same rule holds for a mall pitch and a station pitch, with the queue mattering in both. We keep the alternative on the same quotation, so the owner compares a number instead of a colour.

pink roof boba

Rent and the 90 cup

A mall boba pitch rents at 18,000 yuan a month and a 90 cup day at 18 yuan grosses 48,600. A 90 cup day at a 65 percent margin leaves 13,000 after rent. That number belongs on the kiosk plan, because a watt figure agreed verbally rarely survives the first electricity bill. Most of these gaps appear at the first rush, which is exactly when the counter is busiest.

A 120 cup day leaves 30,000. The gap between 90 and 120 is not the LED, it is the 4 hour pearl and the 3 station line, and both are service kiosk. Mark it on the drawing sheet too, so whoever adds a station later has the reference without guessing. One Saturday settles the question faster than a week of drawing revisions.

Conclusion

A 900 mm counter, a 2,400 mm canopy, a 12 W strip at 2,700 K set 60 mm back, 3 stations and a 3 kg pearl batch. Those six turn an LED kiosk into a 120 cup shop. None of that shows in a sketch, which is why we mark the strip height and the station split on the plan.

LED sells the queue and the counter serves it. Fit a warm strip and 3 stations, and a boba kiosk holds 120 cups a day on 6 sqm. Owners who settle it at design stage pay nothing extra, and owners who settle it after opening pay a driver upgrade. The same rule holds for a mall pitch and a station pitch, with the queue mattering in both.

kiosk depth

Depth the counter at 700 mm and the back worktop at 600 mm. A 500 mm counter cannot hold a sealer and a cup and a shallow counter moves the line shop fit out. We keep the alternative on the same quotation, so the owner compares a number instead of a colour. That number belongs on the kiosk plan, because a watt figure agreed verbally rarely survives the first electricity bill.

purple dot boba

Leave A Comment