Fast charging in 3 numbers
EV fast charging runs on 3 numbers: a 60 kW pile, an 18 minute window and a 4 dollar cost. Three numbers settle whether a driver waits 18 minutes or 4 hours. The same rule holds for a home box and a motorway pile, with the plug type mattering in both. We keep the alternative on the same sheet, so the driver compares a minute instead of a logo.
A 60 kW DC pile adds 200 km in 30 minutes and a 7 kW AC box adds the same in 4 hours. A 16 kW gap is the difference between retail displays. That number belongs on the charging sheet, because a kilowatt agreed verbally rarely survives a winter night. Most of these gaps appear on the first cold morning, which is exactly when the battery is coldest.
Plug 1: the 60 kW DC
A 60 kW DC pile reads 60 kW at peak and 45 kW at 80 percent charge. A peak of 60 for 20 minutes and 45 for 10 is 27 kWh, which is 180 km of range. Mark it on the sheet too, so whoever plans the next trip has the reference without guessing. One 20 minute stop settles the question faster than a week of app browsing.
A 120 kW pile halves that to 15 minutes and costs 1.8 times the price. Two piles at 120 kW serve 8 cars an hour and one 60 kW pile kiosk design. None of that shows on a charger map, which is why we mark the plug and the price on the sheet. Drivers who settle it before a purchase pay nothing extra, and drivers who settle it after a purchase pay a queue.
Plug 2: the 11 kW AC
An 11 kW AC box fills a 60 kWh battery in 5.5 hours and a 150 kW DC fills it in 32 minutes. Ten times the time for a fifth of the cost, which shop fixtures. The same rule holds for a home box and a motorway pile, with the plug type mattering in both. We keep the alternative on the same sheet, so the driver compares a minute instead of a logo.
An 11 kW box at home runs 0.20 a kWh and a DC pile runs 0.45. Sixty kWh at 0.20 is 12 dollars and at 0.45 is 27, and a night charge is 15 dollars cheaper. That number belongs on the charging sheet, because a kilowatt agreed verbally rarely survives a winter night. Most of these gaps appear on the first cold morning, which is exactly when the battery is coldest.
Plug 3: the 3.6 kW emergency
A 3.6 kW plug adds 15 km an hour and a 60 kWh battery needs 16 hours. Sixteen hours on a 3.6 kW plug is a full working day, which is why it stays an emergency line. Mark it on the sheet too, so whoever plans the next trip has the reference without guessing. One 20 minute stop settles the question faster than a week of app browsing.
A 3.6 kW line on a 16 A circuit is 3.6 kW and a 32 A line is 7.4 kW. A 3.8 kW gap is 4 hours saved on a 60 kWh battery and a thicker cable. None of that shows on a charger map, which is why we mark the plug and the price on the sheet.
Read a plug, a cable and a breaker before a purchase. A 7.4 kW plug on a 16 A breaker trips at 30 minutes and a 3.6 kW plug service kiosk. Drivers who settle it before a purchase pay nothing extra, and drivers who settle it after a purchase pay a queue. The same rule holds for a home box and a motorway pile, with the plug type mattering in both.

Four numbers for a fast charge
The table is the sheet we use on a fast charging stop, and each line answers a kilowatt, a minute or a dollar rather than a slogan. We keep the alternative on the same sheet, so the driver compares a minute instead of a logo. That number belongs on the charging sheet, because a kilowatt agreed verbally rarely survives a winter night.
| Item | Number |
|---|---|
| DC peak power | 60 kW |
| Minutes to 80 percent | 30 |
| Range added | 180 km |
| Home AC box | 11 kW |
| Battery | 60 kWh |
| DC price | $0.45 a kWh |
| Home price | $0.20 a kWh |

Cost 1: the 27 dollar DC fill
A 60 kWh fill on a DC pile at 0.45 is 27 dollars and the same fill at home is 12. A 15 dollar gap over 200 fills is 3,000 dollars, which is a home box installed twice. Most of these gaps appear on the first cold morning, which is exactly when the battery is coldest. Mark it on the sheet too, so whoever plans the next trip has the reference without guessing.
A DC fill at 27 dollars covers 400 km at 0.067 a km and petrol at 7 litres per 100 km costs 0.13 a km. Half the running cost, and a home box fixture materials. One 20 minute stop settles the question faster than a week of app browsing. None of that shows on a charger map, which is why we mark the plug and the price on the sheet.
Cost 2: the 4,000 dollar pile
A 60 kW DC pile costs 25,000 to 40,000 dollars installed and an 11 kW home box costs 1,500. A pile at 30,000 is 20 home boxes and a site needs 4 piles to serve 12 cars. Drivers who settle it before a purchase pay nothing extra, and drivers who settle it after a purchase pay a queue.
A pile at 30,000 dollars serving 8 cars an hour earns 27 dollars a fill. Ten fills a day is 270 dollars and 98,000 a year, which pays a pile back cash counters. The same rule holds for a home box and a motorway pile, with the plug type mattering in both. We keep the alternative on the same sheet, so the driver compares a minute instead of a logo.
The 18 minute stop
An 18 minute stop covers a 200 km top up, a 4 minute payment and a 2 minute cable. Eighteen minutes is the number a driver plans around and 30 is the number a queue builds on. That number belongs on the charging sheet, because a kilowatt agreed verbally rarely survives a winter night. Most of these gaps appear on the first cold morning, which is exactly when the battery is coldest.
A 200 km top up at a 60 kW pile takes 20 minutes from 20 percent to 80. A 20 minute stop and a 25 minute break is 5 minutes of slack, which is why a site counters and towers. Mark it on the sheet too, so whoever plans the next trip has the reference without guessing.

Conclusion
A 60 kW pile, an 18 minute stop, a 4 dollar difference and a 4,000 dollar install per pile. Three plugs and four costs answer a fast mall kiosk layout. One 20 minute stop settles the question faster than a week of app browsing. None of that shows on a charger map, which is why we mark the plug and the price on the sheet.
Plan a DC stop and a home box together. A home box at 1,500 dollars covers 90 percent of nights and a DC pile covers the 10 percent that a 400 km day needs. Drivers who settle it before a purchase pay nothing extra, and drivers who settle it after a purchase pay a queue. The same rule holds for a home box and a motorway pile, with the plug type mattering in both.
Check a bay at 5 m and a cable at 4 m. A 5 m bay fits a van and a 4 m cable reaches a rear port without display cases. We keep the alternative on the same sheet, so the driver compares a minute instead of a logo. That number belongs on the charging sheet, because a kilowatt agreed verbally rarely survives a winter night.