
Five numbers a designer signs
An interior designer on a shop job is measured by 5 numbers: a 1:50 a plan, a 1,200 mm a sight line, a 300 mm a service gap, a 6 week a package and a 3 revision a round. A drawing set that misses 2 lands a cabinet in the wrong bay. The same rule holds for a Shenzhen shop and a Dubai one, with the service gap mattering in both.
A 1:50 plan with a 1,200 mm sight line and a 300 mm service gap ships in 6 weeks over 3 revisions, so a number decides a drawing display cases. We keep the number on the same set, so a factory compares a gap schedule instead of a render. That number belongs on a drawing set, because a scale agreed verbally rarely survives a site delivery.
Draw 1:50 and hold 1,200 mm
A 1:50 plan shows a cabinet and a 1:100 hides it, and a sight line runs 1,200 mm. A shop draws 40 bays. Most of these misses appear at 1:100, which is exactly where 1:50 shows. Mark it on the set too, so whoever fits the next shop has the reference. One tape run along a bay settles the question faster than a month of email.
A 1:50 set costs 4,200 and a 1:100 2,600, and 1,600 buys a scale. A 1:100 set misses a cable at 1 in 3 bays and a miss costs 160 of a re-fit, which is retail displays None of that shows in a render, which is why we print the numbers on a set. Designers who read a set pay nothing extra, and designers who skip it pay a re-fit.

Leave 300 mm for service
A 300 mm gap passes a plug and a 100 mm traps it, and a run spans 20 bays. A shop orders 3 sets. The same rule holds for a Shenzhen shop and a Dubai one, with the service gap mattering in both. We keep the number on the same set, so a factory compares a gap schedule instead of a render. That number belongs on a drawing set, because a scale agreed verbally rarely survives a site delivery.
A 300 mm gap costs 0 and a 100 mm 0, and 0 buys a tape. A 100 mm gap traps a cable at 1 in 4 bays and a trap costs 90 of a re-drill, which is fixture materials Most of these misses appear at 1:100, which is exactly where 1:50 shows. Mark it on the set too, so whoever fits the next shop has the reference.

Four numbers on a drawing set
The set is what a designer and a factory both sign, and each line answers a scale, a millimetre or a week shop fixtures. One tape run along a bay settles the question faster than a month of email. None of that shows in a render, which is why we print the numbers on a set. Designers who read a set pay nothing extra, and designers who skip it pay a re-fit.
| Number | Value |
|---|---|
| Plan scale | 1:50 |
| Sight line | 1,200 mm |
| Service gap | 300 mm |
| Package | 6 weeks |
| Revisions | 3 rounds |
Ship in 6 weeks over 3 rounds
A 6 week package fits a lease and a 12 week eats a fit-out, and a job revises 3 times. A brand opens 4 shops. The same rule holds for a Shenzhen shop and a Dubai one, with the service gap mattering in both. We keep the number on the same set, so a factory compares a gap schedule instead of a render.
A 6 week package costs 9,000 and a 12 week 15,000, and 6,000 buys 6 weeks. A 12 week package slips a rent at 1 in 4 shops and a slip costs 3,000 of a rent, which is counters and towers That number belongs on a drawing set, because a scale agreed verbally rarely survives a site delivery. Most of these misses appear at 1:100, which is exactly where 1:50 shows.

Check 1 set against 1 site
A site check reads a sight line and a gap in 90 minutes, and a shop checks 2 times. A job runs 2 checks. Mark it on the set too, so whoever fits the next shop has the reference. One tape run along a bay settles the question faster than a month of email. None of that shows in a render, which is why we print the numbers on a set.
A check costs 0 and a skip 0, and 0 buys 90 minutes. A skipped check keeps a 1:100 error at 1 in 3 bays and an error costs 480 a shop, which is retail displays Designers who read a set pay nothing extra, and designers who skip it pay a re-fit. The same rule holds for a Shenzhen shop and a Dubai one, with the service gap mattering in both.

Conclusion
Fifty, 1,200, 300, 6 and 3. Five numbers keep a drawing a drawing. We keep the number on the same set, so a factory compares a gap schedule instead of a render. That number belongs on a drawing set, because a scale agreed verbally rarely survives a site delivery. Most of these misses appear at 1:100, which is exactly where 1:50 shows. Mark it on the set too, so whoever fits the next shop has the reference.
Ask for a plan scale and a gap schedule. A 4,200 set and a 300 mm gap protect 480 a shop and 360 a shop. One tape run along a bay settles the question faster than a month of email. None of that shows in a render, which is why we print the numbers on a set. Designers who read a set pay nothing extra, and designers who skip it pay a re-fit.
Read a plan scale before a render. A 1:50 set and a 300 mm gap keep a cabinet in its bay, mall kiosk layout. The same rule holds for a Shenzhen shop and a Dubai one, with the service gap mattering in both. We keep the number on the same set, so a factory compares a gap schedule instead of a render. That number belongs on a drawing set, because a scale agreed verbally rarely survives a site delivery.
