Avada Car Dealer News

Brief before drawing

A kiosk design starts with 4 numbers and not a mood: frontage in metres, target sales per day, product count, and the lease term. Without those 4 the drawing is a picture and not a design. Most of these gaps appear at handover, which is exactly when a 900 mm counter leaves no aisle. Mark it on the sheet too, so whoever draws the next kiosk has the reference without guessing.

A brief with 4 numbers takes 90 minutes and saves 3 redraws, and a redraw costs 480 dollars and 2 weeks. Ninety minutes against 1,440 is the cheapest hour shop fixtures. One site visit settles the question faster than a week of render browsing. None of that shows in a mood board, which is why we mark the metres and the panels on the sheet.

Layout at 6 sqm

A 6 sqm kiosk splits into 3.2 sqm of selling face and 2.8 sqm of operator space, and 3.2 sqm at 700 mm depth holds 4 counters. A 2.4 sqm selling face holds 3 and queues at 4 customers. Owners who settle it before a drawing pay nothing extra, and owners who settle it after a build pay a re-order.

A 700 mm counter depth costs 260 dollars a metre and a 900 mm 330, and 900 mm on 4 counters is 1,320 against 1,040. Two hundred and eighty dollars buys 0.8 sqm of operator aisle that fixture materials. The same rule holds for a Shenzhen mall and a London one, with the 700 mm depth mattering in both. We keep the alternative on the same sheet, so the owner compares a drawing instead of a render.

kiosk sketch

Materials at 3 grades

A carcass in 18 mm plywood costs 96 dollars a linear metre, 18 mm chipboard 62, and 18 mm MDF 74, and plywood holds a 6 year lease where chipboard swells at 18 months in a humid mall. That number belongs on the design sheet, because a metre agreed verbally rarely survives a fit-out. Most of these gaps appear at handover, which is exactly when a 900 mm counter leaves no aisle.

Plywood costs 34 dollars more per metre than chipboard and 12 metres is 408. One swollen chipboard carcass costs 210 a bay to replace, and 2 bays at 18 months is 420 retail displays. Mark it on the sheet too, so whoever draws the next kiosk has the reference without guessing. One site visit settles the question faster than a week of render browsing.

store axon sketch

Five numbers on the sheet

The sheet is what we send before a drawing starts, and each line answers a metre, a dollar or a month rather than counters and towers. None of that shows in a mood board, which is why we mark the metres and the panels on the sheet. Owners who settle it before a drawing pay nothing extra, and owners who settle it after a build pay a re-order.

Step Number
Brief 90 minutes
Selling face 3.2 sqm of 6
Counter depth 700 mm
Carcass panel 18 mm
Drawing set 3 sheets

Three sheets, not thirty

A kiosk design needs 3 sheets: a plan with dimensions, an elevation with counter heights, and a lighting plan with lux at the tray. A 30 sheet set adds 1,600 dollars and no clarity. The same rule holds for a Shenzhen mall and a London one, with the 700 mm depth mattering in both. We keep the alternative on the same sheet, so the owner compares a drawing instead of a render.

A 3 sheet set costs 640 dollars and a 30 sheet 2,240, and 1,600 dollars buys a first article sample instead. A sample at 1,600 dollars proves a finish and a 30 sheet set display cases. That number belongs on the design sheet, because a metre agreed verbally rarely survives a fit-out. Most of these gaps appear at handover, which is exactly when a 900 mm counter leaves no aisle.

Sample at 1,600

A first article sample is one 600 mm counter built in the real finish, and 1,600 dollars shows a laminate edge, a hinge gap and a strip colour before 12 bays exist. A render shows none of them. Mark it on the sheet too, so whoever draws the next kiosk has the reference without guessing. One site visit settles the question faster than a week of render browsing.

A 600 mm sample at 1,600 dollars saves a 12 bay re-order at 8,400, and one re-order pays 5 samples. Owners who skip the sample spend the 1,600 later as a change order glass showcases. None of that shows in a mood board, which is why we mark the metres and the panels on the sheet. Owners who settle it before a drawing pay nothing extra, and owners who settle it after a build pay a re-order.

store plan sketch

Sign-off at 5 days

A design signs off in 5 days with 3 sheets, 1 sample and 4 numbers, and 5 days sits inside a mall fit-out window of 21 days. A 15 day sign-off eats 10 of the 21 and pushes an opening. The same rule holds for a Shenzhen mall and a London one, with the 700 mm depth mattering in both. We keep the alternative on the same sheet, so the owner compares a drawing instead of a render.

A 5 day sign-off at 640 dollars of drawing time and a 15 day at 1,920, and 1,280 dollars is half a counter. Ten days of delay costs 4,200 dollars of rent at 420 a day, so cash counters. That number belongs on the design sheet, because a metre agreed verbally rarely survives a fit-out. Most of these gaps appear at handover, which is exactly when a 900 mm counter leaves no aisle.

counter layout plan

Conclusion

Four numbers, 3.2 sqm, 700 mm, 18 mm and 3 sheets. Five items turn a kiosk design cosmetic kiosk. Mark it on the sheet too, so whoever draws the next kiosk has the reference without guessing. One site visit settles the question faster than a week of render browsing. None of that shows in a mood board, which is why we mark the metres and the panels on the sheet.

Write the brief in 90 minutes, draw 3 sheets, build 1 sample. The 640 dollar drawing set and 1,600 dollar sample protect a 8,400 re-order and a 4,200 rent overrun. Owners who settle it before a drawing pay nothing extra, and owners who settle it after a build pay a re-order. The same rule holds for a Shenzhen mall and a London one, with the 700 mm depth mattering in both.

mall kiosk layout

Check a selling face at 3.2 sqm and a counter at 700 mm. Three point two square metres holds 4 counters and 700 mm keeps an operator aisle inside 6 sqm. We keep the alternative on the same sheet, so the owner compares a drawing instead of a render. That number belongs on the design sheet, because a metre agreed verbally rarely survives a fit-out.